Saturday 17 January 2015

IAF gets first light combat

 The handover signals the start of a process of induction of the fighters being built at home under a project which has already cost the exchequer nearly Rs. 8,000 crore.

The entire project by the DRDO and Hindustan Aeronautics Limited is estimated to cost over Rs. 30,000 crore.

The aircraft that has been handed over has got Initial Operational Clearance—II, which signifies that Tejas is airworthy in different conditions, sources said. The Final Operational Clearance (FOC) is expected by the year—end.

This version of the aircraft lacks the latest electronic warfare suite, which was integrated into one of the LCAs two weeks ago, mid—air refuelling and long—range missiles capabilities, among other things that the FOC—configuration aircraft will have.

The IOC—I was granted to the aircraft, being built by state—owned Hindustan Aeronautics Limited (HAL), in January 2011.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.